ItemProject NameOwnerScope of WorksContract Amount, RMAwarded Date
 1.LNG Train-9 ProjectPETRONAS LNG Sdn BhdJGC Corporation / Synerlitz Fabrication and Installation of Underground Fire Water (GRE) and Drinking Water Piping.3.0 Million2014
 2.Shelter and Link Ways for MLNG Admin AreaMLNGKemudi Harta Sdn Bhd Shelter and Link Way for MLNG Admin Building150 K2014
 3.LNG Train-9 ProjectPETRONAS LNG Sdn BhdJGC / Muhibbah Steel Industry Steel Structure Erection for LNG Train9 Project 500 Tons of Pipe Rack & Steel structure1.8 Million2014
 4.LNG Train-9 ProjectPETRONAS LNG Sdn BhdJGC / Nippon Express (NEX) Manpower Supply for Steel Structure Erection at LNG Train9 Project. Approx. 150 workers3.0 Million2014 ~ 2016
 5.PGB Cogen Plant – GPP A&BPetronas Gas Berhad (GPP A)Shinryo – Kencana Consortium (SKC) Manpower Supply350 K2014
 6.AN Tank – Toray PlasticToray Plastic (M)Fabrication and Erection of AN Tank with Dome roof  – Manpower supply600K2014
 7.JGC LNG Train-9 ProjectPETRONAS LNG Sdn. Bhd.Piping Installation at Gas Metering Station area.2.5 Million2015
 8.Prototype Module Chiller SkidShinryo Corporation (Middle East)Shinryo Corporation Prototype Module Chiller Skid FabricationUSD 350K2015
 9.Toray, Co-GenerationToray Plastic CorporationShinryo (Malaysia) Sdn Bhd Design, Fabrication & Installation for 2 nos of tank Ø3.5m x 5.5m(H), 60m3 Ø4.0m x 66.0m(H), 75m3500 K2015
 10.DG3 Recovery Main Works at PS2Tokuyama  Malaysia Sdn. Bhd.EPCC Work for Existing Plant Upgrading of Waste Recovery System788 KSep 2015
 11.ABF Cooling Tower Pit-88 Modification ProjectAsean Bintulu Fertilizer (ABF)Kemudi Harta Sdn Bhd Fabrication & Installation for Steel Structure, Piping & Pump Erection Works300 KOct 2015
 12.Molecor Bath TankMolecor Asia PacificCSN Global Sdn Bhd Fabrication of stainless steel bath tank42 KJan 2015
 13.MLNG Car ParkMLNGKemudi Harta Sdn Bhd Management Car Park Extension49KMar 2016
 14.PS-1 Drain Modification Work for PSD2MTokuyama Malaysia Sdn. Bhd.Shutdown Modification works for Tokuyama Phase 1 Pump Drain line480 KMar 2016
 15.MLNG T-3607 Piping WorkMLNGToyo Kanetsu Malaysia (TKM) Piping Fabrication and Erection Works for LNG Tank 7, MLNG New 165,000m3 Liquefied Natural Gas Storage Tank, T-36076.2MMar 2016
 16.PGB Cogen Plant – GPP-A (Kerteh) Petronas Gas Berhad (GPP A)Shinryo – Kencana Consortium (SKC) Manpower Supply for COGEN Shutdown Works152KMar 2016
 17.Lifting Aid Fabrication – MOPUMurphy Oil CorporationTransfame Sdn Bhd Lifting Aid, Blind Flange Fabrication Works for MOPU SATU35KAug 2016
 18.PGB Cogen Plant – GPP-A (Kerteh) GPP-B (Santong)Petronas Gas Berhad (GPP A B)Shinryo – Kencana Consortium (SKC) Manpower Supply for COGEN Shutdown Works110KSept 2016
 19.ABF 2016 Pit Stop S/D WorksAsean Bintulu Fertilizer (ABF)Fumiko Sdn Bhd ABF Pit Stop, Shutdown Hot work for piping and LWRS215KOct 2016
 20.Vestigo – Spool FabricationMurphy Oil CorporationTransfame Sdn Bhd Anjung Kecil Hock Up Improvement Project In-fill , Vestigo48KNov 2016
 21.SAPA-WI Deck extension fabricationMurphy Oil CorporationTransfame Sdn Bhd SAPA Water Injection, Platform Structural Fabrication Works, Murphy Oil Corp418.6KApr 2017
 22.Merdeka PNB118 (KL118) DCSPNB Berhad  Shinryo (Malaysia) Sdn. Bhd. Supply, Fabricate & Install; Hubless cast iron embedded drain pipe Embedded Pipe Installation75K    May 2017   Nov 2017
 23.SAPA-WI Pipe Spool FabricationMurphy Oil CorporationTransfame Sdn Bhd SAPA Water Injection, Piping fabrication Works, Murphy Oil Corp1.5 MJun 2017
 24.ABF Staff Car Park  Asean Bintulu Fertilizer (ABF)Kemudi Harta Sdn Bhd Car Park, Guard House and Contractors’ Rest Area Roof Replacement New Car Park Roof300KJun 2017
 25.Kidurong Power Station Gas Pipeline No 1 ReplacementSEB Power Sdn BhdConsortium Group Engineer Malaysia – KSL PD Engineering Gas Pipeline No 1 Replacement Works13.98 MSep 2017
 26.ABF E&I WorkshopAsean Bintulu Fertilizer (ABF)E&I Warehouse Renovation and Extension Works640KNov 2017
 27.Pipe Clamp & Insulation Cold ShoeOCI(M)
 Sdn Bhd
KSM Innovation Sdn Bhd Supply of Pipe Clamp, and PU Cold Shoe130KNov 2017
 28.Bintulu Port, Crane RefurbishmentCMS Cement Sdn BhdTenova Australia Pty Ltd CMS Cement Bintulu Port Loading Crane Refurbishment Works24KDec 2017
 29.MLNG
Module 1 & 3
MLNG PetronasKSL PD Engineering Sdn Bhd Spool Fabrication and Chemical Cleaning for MHI HRSG500KDec 2017
 30.Gas Train Dual Fuel Package BoilerBorneo Edible OilSupply of Gas Train Skid and Regulator Set for Boiler318KFeb 2018
 31.Insulation Cold ShoeOCI(M)
 Sdn Bhd
KSM Innovation Sdn Bhd Supply of PU Cold Shoe185KMar 2018
 32.Lump BreakerAsian Bintulu Fertilizer (ABF)Kemudi Harta Sdn Bhd Fabrication, Supply and Delivery of Lump Breaker for Granulation80KJune 2018
 33.Maintenance JobSakura Ferroalloys Sdn BhdSteel Structure Fabrication and Installation Works Structure Modification Works Manpower Supply170K2018
 34.Maintenance JobElkem Carbon Malaysia Sdn BhdSteel Structure Fabrication and Installation Works Structure Modification Works Manpower Supply64K2018
 35.Civil PackageOCI(M)
 Sdn Bhd
Air Liquide Malaysia Sdn Bhd New N2 Plant to Existing OCIM Plant, Samalaju – CSA Construction Scope561.5KSept 2018
 36.Mechanical PackageOCI(M)
 Sdn Bhd
Air Liquide Malaysia Sdn Bhd New N2 Plant to Existing OCIM Plant, Samalaju – Mechanical Scope1.05 MOct 2018
 37.ABF Structure WorkAsian Bintulu Fertilizer (ABF)Kemudi Harta Sdn Bhd Provision of General Exhaust Ventilation (GEV) Structure Replacement Work190KDec 2018
 38.Steps to Perfect Pertama ProjectPertama Ferroalloys Sdn BhdGlobe Valve Installation519KJan 2019
 39.Steps to Perfect Pertama ProjectPertama Ferroalloys Sdn BhdAdditional Manifolds and Reticulation Installation1.63 MJan 2019
 40.Steps to Perfect Pertama ProjectPertama Ferroalloys Sdn BhdDay Bin Weigh Flash Support275KFeb 2019
 41.MPA Cooling Water SystemMalaysian Phosphate Additives (S) Sdn. Bhd.Design, Supply, Fabrication, Installation, Testing & Commissioning of Air Fan Cooling Type Cooling Water Station with Maximum Capacity of 2539 m3/Hr6.6MMar 2019
 42.Steps to Perfect Pertama ProjectPertama Ferroalloys Sdn BhdPneumatic Transfer Line FeSi760KApr 2019
 43.Steps to Perfect Pertama ProjectPertama Ferroalloys Sdn BhdFabricate, Supply and Install Hydraulic Piping775KApr 2019
 44.BAGSF ProjectPetronasBintulu Additional Gas Sales Facility (BAGSF) Project10MJun 2019
 45.Steps to Perfect Pertama ProjectPertama Ferroalloys Sdn BhdFeSi Off Gas Water Cooled Ducting3.68MOct 2019
46. Repair and Grouting at Offshore platformPetronas CarigaliTanjung Offshore Services Sdn. Bhd. Repair and grouting of corroded conductor BE-14 on BEDP-A Platform1.51MMay 2020
 47.Façade for Landmark LocationJKR SarawakBBR Construction Systems Sdn Bhd External Façade for Bintangor Bridge, Kuching6.29MJun 2020
 48.Repair and Grouting at Offshore platformPetronas CarigaliTanjung Offshore Services Sdn. Bhd. Repair and grouting of corroded conductor TK-35 on TKJT-C Platform1.76 MAug 2020
 49.EPCC of Diesel Storage TankMPAS Sdn BhdDesign and Build of the Diesel Storage Tank System320 kSep 2020
 50.SEB Laku PipelineSarawak Energy Berhad (SEB)Installation of new water supply pipeline1.5 MApr 2021
 51.SiMn Electrode CasingPertama Ferroalloys Sdn Bhd (PFSB)Supply, Fabricate and Installation of SiMn Electrode Casing5.5 M per annumMay 2021 – Dec 2024
 52.Manpower SupplyMalaysian Phosphate Additives (MPA)MPA Manpower Supply1.3MAug 2021
 53.Supply and Fabricate Piping Support – MurumSarawak Energy Berhad (SEB)Fabrication, Supply and Delivery of Firefighting Support Brackets for Murum HEP56.4KAug 2021
 54.Repair Work Fire Fighting PipelineSarawak Energy Berhad (SEB)Repair Work on Murum HEP Fire Fighting System Pipeline55KJuly 2021
 55.Rewinding Cooling Water PumpSarawak Energy Berhad (SEB)Rewinding Work of Cooling Water Pump Motor for Murum HEP50KAug 2021
 56.Manpower Supply – Long TermPertama Ferroalloys Sdn Bhd (PFSB)Pertama Annual Manpower Supply for Long Term (Nov 2020-Nov 2021)775K    Aug 2021-Aug 2022
 57.Aboveground Mainline for Fire HydrantPertama Ferroalloys Sdn Bhd (PFSB)Supply, Deliver, Installation & Commissioning of Aboveground Fire Main Pipeline7.8 M    Nov 2021- Jun 2022
58.Manpower Supply – Shutdown Works Pertama Ferroalloys Sdn Bhd (PFSB) Manpower Supply for Minor and Major Shutdown Works – 1 Year Contract469KAugust 2021 – July 2022
59.Long Term Contract – Manpower Supply Pertama Ferroalloys Sdn Bhd (PFSB) Long Term Manpower Supply of 1 Year (1/12/2021 – 30/11/2022)853KDecember 2021 – November 2022